Projects

Brewery Demineralisation

Breweries & Distilleries · Two-bed DM · 45 m³/hr reported duty

Brewery Demineralisation
ENE FLUIDTEK / PROJECT RECORD
Case study / Breweries & Distilleries

Project overview

This project profile expands the information provided in the original website. Performance figures and project permissions should be confirmed against commissioning records before publication.

Project type
Breweries & Distilleries
Reported duty
45 m³/hr
Treatment train
Two-bed DM
Reported year / region
2022 / Andhra Pradesh

Challenge, solution and reported result

A useful technical case study focuses on the engineering problem and evidence of the result.

01 / PROJECT NOTE

The challenge

The brewery needed a more consistent low-mineral supply for recipe control and dilution.

02 / PROJECT NOTE

Engineering approach

The existing project description lists two-bed demineralisation with automatic regeneration and post-mix blending.

03 / PROJECT NOTE

Reported outcome

The source page describes improved batch consistency; measured evidence should be added when approved.

Treatment stages

Explore the systems described in this project.

Have a project with a similar water challenge?

Send your source-water report and desired production capacity.

Request a quote