Projects

Bottling Iron Removal & RO

Beverages & Bottling · Iron removal + RO · 60 m³/hr reported duty

Bottling Iron Removal & RO
ENE FLUIDTEK / PROJECT RECORD
Case study / Beverages & Bottling

Project overview

This project profile expands the information provided in the original website. Performance figures and project permissions should be confirmed against commissioning records before publication.

Project type
Beverages & Bottling
Reported duty
60 m³/hr
Treatment train
Iron removal + RO
Reported year / region
2024 / Jharkhand

Challenge, solution and reported result

A useful technical case study focuses on the engineering problem and evidence of the result.

01 / PROJECT NOTE

The challenge

The raw-water source required iron pretreatment and further membrane separation for a bottling application.

02 / PROJECT NOTE

Engineering approach

The existing project page documents an iron-removal stage upstream of an RO system.

03 / PROJECT NOTE

Reported outcome

Outlet-quality tests, commissioning photographs and uptime data can be published after client review.